Testimonials

“Your Company was brought in at short notice when we were let down by another building contractor and you grasped the project, driving it forward to a successful conclusion.

We have no hesitation in contacting Quantum Construction Ltd for any future works on the school or indeed recommending you to any other bodies carrying out building works.”



The Stourport High School and Sixth Form Centre

Projects - Wrekin Retail Park, Telford
Wrekin Retail Park, Telford

Download Project Specification Sheet PDF
Project:
Wrekin Retail Park, Telford
Location:
Wrekin Retail Park, Telford
Value:
£801k
Client:
Hammerson (Telford) Ltd
Contract:
JCT 2011 Design & Building
Duration:
13 weeks
Architect:
Emission Zero
Structural Engineer:
ROC Consulting
 
Download Project Specification Sheet PDF

Works consisted of the construction of a single storey retail unit, which was divided into units for Costa Coffee and Subway.

The shell building design  offered a carbon neutral usage of the building through a well choreographed installation of passive air systems, underfloor heating, air source heat pumps, photovoltaic’s and rainwater harvesting.

The distinctive curved design was achieved by the use of timber glue-lam beams, a curved roof and timber rain screen cladding. Curtain walling to the remaining elevations ensured that the units were supplied with plenty of daylight.

Construction took place in a busy, operational retail park with a tight site footprint, whilst also incorporating alterations to the car park, landscaping and introduction of additional mains services