You have completed the task with minimal disruption to the College’s activities. Your Site Manager has been instrumental in this achievement, always maintaining a strong regard to our interests throughout the whole project, particularly in respect of his dealings with local residents in this sensitive conservation area.”



Ludlow College - Ann Brown, Principal

Projects - Vector Point
Vector Point

Download Project Specification Sheet PDF
Project:
Vector Point
Location:
Moons Moat Road, Redditch
Value:
£1,700,000
Client:
Development Securities
Contract:
Amended JCT 1998 WCD
Duration:
18 Weeks
Architect:
Pinnegar Hayward Design
Structural Engineer:
Farebrother & Partners
 
Download Project Specification Sheet PDF

Refurbishment of existing warehouse 10,244m2 (110,000sq.ft.), and two storey office accommodation of 321m2 (3,455sq.ft.).

Nine new docking facilities, to two separate elevations, were incorporated into the building providing nine hydraulically operated dock levellers, traffic management system and
sectional access doors.

Bulk earth moving operations were carried out to provide an additional 6000m2 (64,600ft2) of concrete hardstandings, incorporating retaining walls, security fencing and revised
drainage.

Provision of new Gatehouse facility with linked services including foul water pumping system.
Warehouse heating and lighting, smoke ventilation and sprinkler systems were all overhauled and serviced. Floor repairs, shot-blasting and application of epoxy floor paint
throughout.

Office refurbishment included replacement of suspended ceiling system, lighting, internal doors floor finishings and redecoration.