“Our experience of Quantum during the Manor Road Brackley project has been very positive. They truly care about the needs of us as a developer and have proved this by finding the right solution to problems even if that solution has had a cost implication to Quantum. As a developer we would struggle to ask for more than this.

Their upfront, hands on advice was exemplary, their teams management throughout and post construction has been excellent and the fact that they completed on budget and improved on the programme target was above the call of duty.  I would have no hesitation in using Quantum on our future projects.

Wrenbridge



Wrenbridge Land Ltd, John McHale

Projects - Stonecross, Wigan
Stonecross, Wigan

Download Project Specification Sheet PDF
Project:
Stonecross, Wigan
Location:
Stonecross Business Park, Wigan
Value:
£520,000
Client:
Development Securities
Contract:
JCT 2005 WCD
Duration:
9 Weeks
Architect:
Pinnegar Hayward Design
Structural Engineer:
The Sprigg Little Partnership
 
Download Project Specification Sheet PDF

Refurbishment of existing warehouse 14,864m2 (160,000sq.ft.), incorporating two storey office accommodation of approximately 600m2 (10,000sq.ft.).

Works included removal of redundant laboratory and food processing facility, comprising two storey steel frame structure with precast concrete floors, within the main warehouse envelope.  Redundant processing equipment, including 15m high exhaust chimney, were removed during demolition period.

Compliance works to satisfy the local Fire Regulations (Manchester Act) included erection of compartment walls to segregate the main sections of warehouse, as well as to heal
the joint with remaining offices.

Warehouse heating and lighting, smoke ventilation, security monitoring and fire alarm systems, including all mechanical doors, were all overhauled and serviced.

Office refurbishment included upgrading and replacement of existing lighting installation, servicing and overhauling of heating system, redecoration and new floor finishings throughout.

External works included replacement of extensive sections of linear drainage and adjacent  concrete hardstandings, along with general remedial works to wall & roof cladding elements.