Pik A Pak

Download Project Specification Sheet PDF
Project:
Pik A Pak
Location:
Ipswich
Value:
£630k
Client:
Pik-A-Pak
Contract:
JCT Design & Build 2011
Duration:
22 Weeks
Architect:
Marsh Associates
Structural Engineer:
Sprigg Little Partnership
Planning Supervisor:
Checkley & Co Chartered Surveyors
 
Download Project Specification Sheet PDF

The project required building an extension to Pik-A-Pak’s existing building in Ipswich.

 

A portal steel framed building was constructed and connected to the existing structure and enveloped in a composite cladding system.

 

The ground floor footprint of 950m2 provided a much needed addition to the premises with the space accommodating a combined series of racking and storage units.

 

The works was challenging due to the limited site available for the building works, which was immediately parallel to a busy thoroughfare.  Careful sequential planning of external activities was required to construct the necessary drainage alterations and retaining wall complete with soft landscaping scheme.