Testimonials

“Quantum Construction have been¬†most considerate to residents during this project.

An unusual ‘customer focus’ approach shown on this survey, quite ‘old-fashioned’ in todays selfish business environment, Well Done”



Blackwood School - Ingram (resident near site)

Projects - NASUWT
NASUWT

Download Project Specification Sheet PDF
Project:
NASUWT
Location:
Hillscourt Education Centre, Rednal, Birmingham
Value:
£648,713
Client:
NASUWT
Contract:
JCT Intermediate Form of Contract
Duration:
WCD 12 Weeks
Architect:
Webb Gray & Partners Ltd
Structural Engineer:
The Sprigg Little Partnership
 
Download Project Specification Sheet PDF

Fast track, high quality, full refurbishment of existing dated conference facility and seminar suites.

Remodelling of stairwell and incorporation of new lift required major structural alteration which in turn compromised access to large proportion of the works.

New full heating and cooling system plus completely refurbished toilets required structural change to accommodate the changes.

Acoustic fabric walling system was introduced onto sound blocking materials to improve the performance of the full array of light and sound equipment installed.

Extensive use of high quality walnut and maple joinery included provision of 8m wide moveable conference desk into feature walling to allow multiple usage of conference hall.

All desking, soft furnishing and tables were introduced over a high quality carpet finish.