Testimonials

“Our experience of Quantum during the Manor Road Brackley project has been very positive. They truly care about the needs of us as a developer and have proved this by finding the right solution to problems even if that solution has had a cost implication to Quantum. As a developer we would struggle to ask for more than this.

Their upfront, hands on advice was exemplary, their teams management throughout and post construction has been excellent and the fact that they completed on budget and improved on the programme target was above the call of duty.  I would have no hesitation in using Quantum on our future projects.

Wrenbridge



Wrenbridge Land Ltd, John McHale

Projects - Glebe Meadow
Glebe Meadow

Download Project Specification Sheet PDF
Project:
Glebe Meadow
Location:
High Street, Albrighton, Shropshire
Value:
£1,200,000
Client:
Newlyn Homes Ltd
Contract:
Amended JCT 1998 WCD
Duration:
44 Weeks
Architect:
Pinnegar Hayward Design
Structural Engineer:
The Sprigg Little Partnership
 
Download Project Specification Sheet PDF

Design and Build project for the construction of six high quality five bedroom houses forming a select residential development in the village of Albrighton, Shropshire.

Sensitive planning control issues required the development to be carefully designed in order to compliment the adjacent properties.

Of particular concern was construction of the private access way which ran under the canopy of mature trees. To resolve the problem the tarmacadam, to the existing private driveway,
was carefully removed and a new road construction using a “Cellweb” system filled with single sized gravel was placed over the formation.

This system of construction had the effect of dissipating imposed traffic loads on the roots of the existing trees, whilst allowing aeration and hydration to occur.

The project also included construction of a private foul water pumping station and associated infrastructure works. All the works were subject to NHBC inspection and approval.