“The incoming tenant made various amendments to their requirements throughout the duration of the contract which did have an impact upon the anticipated completion date, but these amendments were taken in their stride by Quantum and they adapted the programme accordingly which resulted in the project being completed on time.

In summary, I was very pleased at the attitude of Quantum and the ethos of working as a team to achieve completion of the contract within budget and on time. I would have no hesitation in recommending the services of Quantum and are working with them on another potential project.”



Development Securities Plc

Projects - George Henry St, Tipton
George Henry St, Tipton

Download Project Specification Sheet PDF
Project:
George Henry St, Tipton
Location:
George Henry Road, Tipton
Value:
£192,699
Client:
Sheldon & Clayton Ltd
Contract:
Bespoke Contract
Duration:
18 Weeks
Architect:
Michael Chapman Architects
Structural Engineer:
S M Structural Engineering Services
 
Download Project Specification Sheet PDF

Contract was procured by negotiation with Client utilising his
own Architect and Structural Engineer for the design works.

Quantum Construction Limited acted as Project Manager and
Main Contractor for the works

The project involved the extension of some 929 m2 (10,000
ft2) to an existing warehouse.

The brief required the new works to match the existing
structure utilising the same design and material wherever
possible.

A ‘Hi-Fold’ door was incorporated into the building to provide
a 12 metre width of door. When opened, the door provides a
temporary shelter to facilitate unloading vehicles in inclement
weather.

An existing below ground gas membrane and ventilation
system was extended from the original foundation and
incorporated into the new works.