Testimonials

“Your Company was brought in at short notice when we were let down by another building contractor and you grasped the project, driving it forward to a successful conclusion.

We have no hesitation in contacting Quantum Construction Ltd for any future works on the school or indeed recommending you to any other bodies carrying out building works.”



The Stourport High School and Sixth Form Centre

Projects - Culina Logistics, Bristol
Culina Logistics, Bristol

Download Project Specification Sheet PDF
Project:
Culina Logistics, Bristol
Location:
Poplar Way East, Bristol
Value:
£4.93m
Client:
Culina Group Ltd
Contract:
JCT 2005
Duration:
16 Weeks
Architect:
Pinnegar Hayward Design
Structural Engineer:
Complete Design Partnership
 
Download Project Specification Sheet PDF

The project comprised the sub-division of an existing warehouse to construct a circa 200,000 sq ft (18,580 sq m) Chilled Food Store.

 

Due to time constraints the design was not fully determined by the time construction works commenced and thereby a close working relationship was required by all parties to achieve client requirements within a very tight timeframe.

 

The extensive mechanical and electrical service installation was a key element of the construction along with the introduction of a new two storey office facility within the building.

 

A separate refrigeration package, of circa £1,500,000, was undertaken by Star Refrigeration and due to the fast track programme was required to include use of temporary chiller units to permit early access for client stock whilst the permanent chillers were being fabricated.

 

Again due to the client requirement to vacate its adjacent premises prior to completion of the full works Quantum Construction worked closely with the client team to achieve a partial handover at the appropriate juncture.